07 Sep
07Sep

Client: Bova Pump

Project Type: Pump Facility Construction, Stormwater Pipes, Paving/Kerbing, and Maintenance

Budget: R 5,000,000

Completion Date: 09-2014


Background

Bova Pump engaged Cush Developments to undertake a major construction project for their new pump facility. The scope included building the facility, installing stormwater pipes, paving and kerbing the surrounding area, and performing ongoing maintenance. This project was critical for expanding Bova Pump's operations and ensuring efficient management of stormwater and site accessibility.

The Challenge

The project involved several key challenges:

  1. Complex Construction Requirements: The facility construction required precise planning and execution to meet operational standards and accommodate specialized equipment.
  2. Stormwater Management: Effective installation of stormwater pipes was essential to prevent flooding and ensure proper drainage around the new facility.
  3. Paving and Kerbing: The paving and kerbing around the facility needed to be durable and functional, supporting both vehicle and pedestrian traffic.
  4. Maintenance Coordination: Ongoing maintenance tasks had to be planned and executed without disrupting the construction process or the facility's operations.
  5. Budget Management: With a budget of R5 million, the project required careful financial management to balance high-quality construction with cost efficiency.

The Solution

Cush Developments approached the project with a detailed and structured plan:

  1. Facility Construction: The team designed and constructed the pump facility to accommodate Bova Pump's operational needs, ensuring compliance with industry standards and operational efficiency.
  2. Stormwater Management: Advanced techniques were used for the installation of stormwater pipes, including precise grading and trenching to ensure effective drainage and prevent future issues.
  3. Paving and Kerbing: High-quality materials and techniques were employed to pave and kerb the facility's surrounding area, enhancing accessibility and durability.
  4. Maintenance Strategy: A comprehensive maintenance plan was developed to keep the facility and its surroundings in optimal condition, including regular inspections and repairs as needed.
  5. Efficient Budget Utilization: The project was executed within the R5 million budget through strategic procurement, efficient resource management, and cost-effective construction practices.

Results

The project was successfully completed on schedule and within the allocated budget. The new pump facility is fully operational, with efficient stormwater management, durable paving and kerbing, and a robust maintenance strategy in place.

Comments
* The email will not be published on the website.